July 25, 2009
Warning: Oversize Load Ahead
On a per-turbine basis, the cost of transportation and logistics generally varies from around $100,000 to $150,000, said John Dunlop, an engineer with the American Wind Energy Association.
- 
If only man could fly... oh wait! I wonder how much more expensive that option would be.
 - 
Kinda like this?
 - 
Fly my prettys, FLY!!!
 - 
Reminds me of Brian Regan talking about log trucks.